Guide to good practice in the management of time in major projects : (Record no. 85513)

MARC details
000 -LEADER
fixed length control field 01912nam a22003258i 4500
001 - CONTROL NUMBER
control field BDZ0034860962
003 - CONTROL NUMBER IDENTIFIER
control field StDuBDS
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20220329094427.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 180112s2018 enk f 000|0|eng|d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number 9781119428398
Terms of availability 54.95
Qualifying information paperback
040 ## - CATALOGING SOURCE
Original cataloging agency StDuBDS
Language of cataloging eng
Transcribing agency StDuBDS
Modifying agency StDuBDSZ
Description conventions rda
050 #0 - LIBRARY OF CONGRESS CALL NUMBER
Classification number TH438.4
Item number .G85 2018
072 #7 - SUBJECT CATEGORY CODE
Subject category code HOU
Source ukslc
082 04 - DEWEY DECIMAL CLASSIFICATION NUMBER
Edition number 23
245 00 - TITLE STATEMENT
Title Guide to good practice in the management of time in major projects :
Remainder of title dynamic time modelling /
Statement of responsibility, etc. CIOB (The Chartered Institute of Building).
250 ## - EDITION STATEMENT
Edition statement Second edition.
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Chichester :
Name of publisher, distributor, etc. Wiley Blackwell,
Date of publication, distribution, etc. 2018.
300 ## - PHYSICAL DESCRIPTION
Extent 248 pages ;
Dimensions 30 cm
336 ## - CONTENT TYPE
Content type term text
Source rdacontent
337 ## - MEDIA TYPE
Media type term unmediated
Source rdamedia
338 ## - CARRIER TYPE
Carrier type term volume
Source rdacarrier
520 8# - SUMMARY, ETC.
Summary, etc. A practical treatise on the processes and standards required for the effective time management of major construction projects. This book uses logical step-by-step procedures and examples from inception and risk appraisal - through design and construction to testing and commissioning - to show how an effective and dynamic time model can be used to manage the risk of delay in the completion of construction projects. Integrating with the CIOB major projects contract, the new edition places increased emphasis on the dynamic time model as the way to manage time and cost in major projects, as opposed to the use of a static target baseline program. It includes a new chapter distinguishing the principal features of the dynamic time model and its development throughout the life of a project from inception to completion.
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Construction projects
General subdivision Management.
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Production scheduling.
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Time management.
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Building
General subdivision Superintendence.
650 #7 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element House and Home.
Source of heading or term ukslc
710 2# - ADDED ENTRY--CORPORATE NAME
Corporate name or jurisdiction name as entry element Chartered Institute of Building (Great Britain),
Relator term associated with work.
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme Dewey Decimal Classification
Suppress in OPAC Do not suppress
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Home library Current library Shelving location Date acquired Source of acquisition Cost, normal purchase price Full call number Barcode Date last seen Cost, replacement price Price effective from Koha item type
    Dewey Decimal Classification     Trinity Green Library Trinity Green Library Trinity Green 04/02/2022 3 57.25 690.0685/GUI 7412403881 01/07/2022 57.25 04/02/2022 2 week loan