000 | 01837nam a2200421 i 4500 | ||
---|---|---|---|
001 | 376587 | ||
005 | 20170630134840.0 | ||
008 | 121217s2015 enka f 001 0 eng|d | ||
020 |
_a9780415527118 (pbk.) : _c£17.99 |
||
020 |
_a9780203579091 (ebook) : _c£17.99 |
||
020 | _a0415527112 | ||
020 | _a0203579097 | ||
035 | _a(StDuBDS)9780415527118 | ||
040 |
_aStDuBDS _cStDuBDS _erda |
||
072 | 7 |
_aHOU _2eflch |
|
072 | 7 |
_aHOU _2ukslc |
|
082 | 0 | 4 | _223 |
100 | 1 |
_aCartlidge, Duncan P., _eauthor. |
|
245 | 1 | 0 |
_aEstimator's pocket book / _cDuncan Cartlidge, FRICS. |
264 | 1 |
_aLondon : _bRoutledge, _c2013. |
|
300 |
_a310 pages : _billustrations (black and white) ; _c19 cm |
||
336 |
_atext _2rdacontent |
||
336 |
_astill image _2rdacontent |
||
337 |
_aunmediated _2rdamedia |
||
338 |
_avolume _2rdacarrier |
||
504 | _aIncludes bibliographical references and index. | ||
520 | 8 | _a'Estimator's Pocket Book' is a concise and practical reference covering the main pricing approaches, as well as useful information like how to process subcontractor quotations, tender settlement, and adjudication. It is fully up-to-date with the NRM2 throughout, features a look ahead to NRM3, and describes the implications of BIM for estimators. | |
521 | _aSpecialized. | ||
650 | 0 |
_aBuilding _xEstimates. |
|
650 | 0 | _aQuantity surveying. | |
650 | 7 |
_aHouse and Home. _2eflch |
|
650 | 7 |
_aHouse and Home. _2ukslc |
|
942 | _n0 | ||
997 |
_yAlso available as an electronic book _uhttp://lib.myilibrary.com?id=495364&entityid=https://shibboleth.bradfordcollege.ac.uk/idp/shibboleth |
||
999 |
_c50852 _d50852 |