Guide to good practice in the management of time in major projects : dynamic time modelling / CIOB (The Chartered Institute of Building).
Publication details: Chichester : Wiley Blackwell, 2018.Edition: Second editionDescription: 248 pages ; 30 cmContent type:- text
- unmediated
- volume
- 9781119428398
- 23
- TH438.4 .G85 2018
Item type | Home library | Class number | Status | Date due | Barcode | |
---|---|---|---|---|---|---|
2 week loan | Trinity Green Library Trinity Green | 690.0685/GUI (Browse shelf(Opens below)) | Available | 7412403881 |
Browsing Trinity Green Library shelves, Shelving location: Trinity Green Close shelf browser (Hides shelf browser)
A practical treatise on the processes and standards required for the effective time management of major construction projects. This book uses logical step-by-step procedures and examples from inception and risk appraisal - through design and construction to testing and commissioning - to show how an effective and dynamic time model can be used to manage the risk of delay in the completion of construction projects. Integrating with the CIOB major projects contract, the new edition places increased emphasis on the dynamic time model as the way to manage time and cost in major projects, as opposed to the use of a static target baseline program. It includes a new chapter distinguishing the principal features of the dynamic time model and its development throughout the life of a project from inception to completion.
There are no comments on this title.